Read More:https://esurveying.net/vertical-profi...
---------Contents of this Video------
Softech is proud to announce that we have come up with a unique Road Construction Cost-Saving Design Solution ie, PCC Optimisation Algorithm to efficiently save the Road Designing Time and Construction Cost.
This can be achieved by Designing an optimized vertical profile to accommodate the minimum thickness of the Profile Corrective course, especially when the profile corrective course is done with structural layers like BM, DBM, BC, etc.
#roadconstructioncost, #landsurvey, #infrastructure, #autocad, #bricscad, #totalstation
Related Topics
1. Best Road Design Software
2. Vertical Curve - Geometric Design of Roads
3. Save Considerable Road Construction Cost
4. Easily Design National Highway
5. Horizontal Curve, Vertical Curve, Super Elevation, Road Widening Solutions
6. How to Save Profile Corrective Course Cost?
1. Roadways are the Highly Used Mode of Transportation by Human Beings
2. The passenger car unit on the project Road will decide the number of lanes to be added.
3. In Strengthening and widening Projects, It’s mostly advised not to cut Existing Road, if the road is in fair to good condition.
The design is done such that, there is no cutting of the existing good pavement longitudinally or transversely and adhering to the IRC code references and constraints. However, these constraints are allowed to be modified based on on-site requirements.
Designing such an optimized vertical profile can efficiently and considerably reduce the construction cost.
In some of the Case studies done by ESurveying Softech India Private limited, it is estimated that about 40% of the construction cost of profile corrective was achieved on an average, considering the approved designs versus redesigning of the same in PCC Optimisation Algorithm Software.
Advantages of Using PCC Optimisation Algorithm
1. You can Design a vertical profile with Ease and confidence.
2. You can Achieve Consistency in Design Standards
3. Most Importantly You save considerable time and Construction Cost
------Related Subjects------
Road Construction Cost Saving Algorithm - Road Design Software
Road Construction Cost Saving Design
PCC Optimisation Algorithm
Geometric Design of Roads
Vertical Curve
Super Elevation
Indian Road Congress
Cost Saving Algorithm
Save Road Construction Cost
Profile Corrective Course
Design of vertical alignment
Vertical profile road design
Road design
Land Surveying
Infrastructure Engineering
IRC Code
Autocad
---Information about channel------
Subscribe to our YouTube Channel: / esurveyingnet
Realated other video links: • Road Design Software - Geometric Desi...
----Social media----
Follow us on facebook: / esurveying
Read more: https://esurveying.net/railway-box-cu...
Смотрите видео Road Construction Cost Saving Algorithm - Road Design Software онлайн, длительностью часов минут секунд в хорошем качестве, которое загружено на канал ESurveying Softech (India) Pvt. Ltd. 26 Июнь 2019. Делитесь ссылкой на видео в социальных сетях, чтобы ваши подписчики и друзья так же посмотрели это видео. Данный видеоклип посмотрели 5,253 раз и оно понравилось 63 посетителям.