Video showing the rebar stakes in the ground and we are ready to start digging the foundation down 120 cm. We have placed spot footers every 8 x 8 ft for the wood joisted floor. They will be dug 18 inches and filled with concrete to foundation height and raised to floor height with cinder blocks.
Watch video The foundation stakes are in at Ndamoh Mannah... we’re ready to dig online, duration hours minute second in high quality that is uploaded to the channel Ndamoh Mannah House Off Grid 22 January 2020. Share the link to the video on social media so that your subscribers and friends will also watch this video. This video clip has been viewed 41 times and liked it 3 visitors.